Steering Committee Meeting 2022-07-18

Steering Committee Meeting 2022-07-18

Monday, July 18, 2022: 7:00pm to 7:45pm

Table of Contents
  1.  In Attendance
  2.  Agenda
  3.  Minutes

In Attendance

Jeremy, Mike, Don, Ed S, Adrian B, Bob F, John N, Patrick C, Candi C

Agenda

  1. Mike: Shed construction
  2. Mike: electrician coming for welding area, what do you want? Let us know!
  3. WAMO: Keyfob
  4. Adrian: 3D printers update
  5. Jeremy: HYH

Minutes

  1. Mike: Shed construction
  2. Volunteers needed: 3-4, early morning job!
  3. We're shooting for this Saturday or Sunday morning
  4. Jeremy B and Liam G have already volunteered
  5. More volunteer will allow us to work in shirfts while the others rest.
  6. Jeremy will being a popup canopy, cool drinks, and sunblock
  7. Mike: electrician coming for welding area, what do you want? Let us know!
  8. what do you want? Let us know!
  9. Outlets and switches on each post.
  10. Try for at least one 220V on the pedestal where the meter is.
  11. Lights for underneath the patio and some outside the patio, some to light up storage area, flood light over back gate
  12. 50A breaker for big TIG welder
  13. 15A, 20A breakers for various tools.
  14. About 200A total. 
  15. Air compressor
  16. Drill press (Powermatic, in Wood Shop)
  17. Ed: Power requirements sound good, it’s where you put them. Ed wants to consider pull-down retractable power cords (one or two). Ed would like to talk to Mike about it.
  18. Patrick agrees.
  19. Ed would like two or three of the metal shelving units that are out in the backyard.
  20. Ed: pact gravel ready? Mike: Yes, we need to put down about 2” would work, 8x12ft area.
  21. Ed: Shade structure? Mike: It’s coming.
  22. Mike: Electrical meter is backordered, Mike will attempt to find a used one. Not power until then! We’ll pay WAMO directly for power consumption.
  23. Adrian may have found one online. Mike will look into it.
  24. Adrian: Guy may have some wire left over from his last conduit job.
  25. Ed S, Mike R, Patrick C will meet
  26. WAMO: Keyfob
  27. The north bay’s RFID system has crashed. WAMO has asked if Xerocraft can fix it.
  28. Adrian: 3D printers update
  29. Replaced Artillery Sidewinder hotend, $50
  30. ANet hotend overhauled as well
  31. Who is misusing them? Adrian thinks they're putting the SD cards in the wrong machines. Adrian thinks he knows who’s causing it and will talk to them.
  32. Don: Better communication to users! Make sure you’re using the right profile for the right printer! 
  33. Adrian will consider a printer. Don can help make it.
  34. Jeremy: HYH
  35. Canceled this month. Too hot!
  36. Jeremy will consider it for August